Factory-direct pricing · Response within 12 hours

Wastewater & Reuse

Water Reuse & Zero-Liquid-Discharge System

UF + RO + concentrator trains that recover 85–95% of industrial wastewater for return to the process line.

  • ZC-ZLD-30
  • 10–200 m³/h
Water Reuse & Zero-Liquid-Discharge System

What makes this system different

  • Up to 95% recovery
  • Modular train, expandable
  • Salt recovery option
  • Compliance reporting built in

Industrial effluent is a resource. Our reuse trains combine biological or physical pre-treatment with UF, RO and where required a concentrator or evaporator to approach zero liquid discharge.

  • Recovery 85–95%
  • Membrane concentrate further treated by NF or evaporation
  • Salt recovery option
  • Full material selection for aggressive streams

Technical specifications

Model ZC-ZLD-30
Capacity 10–200 m³/h
Recovery rate 85–95%
Installed power 30–200 kW
Power supply 380V / 50Hz / 3Ph (or to client standard)
Frame / wetted material SS316L / duplex
Membrane NF / RO / DTRO
Warranty 24 months
Lead time 25–35 days
Concentrate TDS up to 80,000 mg/L
Train UF → NF/RO → DTRO → evaporator

Specifications are indicative. Final design is confirmed against your water analysis and site conditions.

Typical applications

  • Textile dyeing effluent
  • Electroplating rinse water
  • Food processing wastewater
  • Landfill leachate

Start with your water analysis

Tell us the source, the capacity and the target — we will design the train.

Our engineers reply within 12 working hours with a preliminary process design, equipment list and budget range.

WhatsApp info@www.zhongchunwater.com +86 195 5003 9985