
Wastewater & Reuse
Containerised MBR Wastewater Plant
Integrated A/O + MBR treatment in a 40ft container, discharging to reuse standard in a single compact footprint.
View detailsWastewater & Reuse
Concentrator plus crystalliser trains that take industrial effluent to dry solids — for sites with no discharge permit at all.
When the discharge permit is zero, the water has to leave as vapour and the salts as solids. We build the train in stages so the capital can follow the compliance deadline.
| Model | ZC-ZLD-100 |
|---|---|
| Capacity | 50–500 m³/day |
| Recovery rate | 95–99% |
| Installed power | 120–600 kW |
| Power supply | 380V / 50Hz / 3Ph (or to client standard) |
| Frame / wetted material | SS316L / duplex / titanium |
| Membrane | RO / NF / DTRO |
| Warranty | 24 months |
| Lead time | 25–35 days |
| Final step | Forced-circulation crystalliser |
| Solids | Dry cake, packable |
Specifications are indicative. Final design is confirmed against your water analysis and site conditions.
Start with your water analysis
Our engineers reply within 12 working hours with a preliminary process design, equipment list and budget range.