Factory-direct pricing · Response within 12 hours

Quality system

Quality & Certifications

Documented manufacturing, factory acceptance testing and third-party certification for every system we ship.

Certification

Management systems and product compliance

ISO 9001

Quality management

Design, fabrication and service of water treatment equipment.

ISO 14001

Environmental management

Waste handling, coating processes and workshop emissions.

ISO 45001

Occupational health & safety

Workshop safety, lifting operations and site work procedures.

CE

Machinery & LVD

Declaration of conformity with EU machinery and low-voltage directives.

RoHS

Restricted substances

Electrical components compliant with RoHS 2 restrictions.

SGS / BV

Third-party inspection

Pre-shipment inspection arranged on request at buyer’s cost.

Factory acceptance test

What happens before your system ships

  1. 01

    Hydrostatic test

    Every pressure vessel and pipe run tested at 1.5× design pressure.

  2. 02

    Electrical & PLC check

    Point-to-point wiring verification, alarm and interlock simulation.

  3. 03

    Wet test

    System run on real or simulated feed water to confirm flow, pressure and quality.

  4. 04

    Documentation pack

    Material certificates, P&ID, electrical drawings, O&M manual, test report.

Start with your water analysis

Tell us the source, the capacity and the target — we will design the train.

Our engineers reply within 12 working hours with a preliminary process design, equipment list and budget range.

WhatsApp info@www.zhongchunwater.com +86 195 5003 9985