Factory-direct pricing · Response within 12 hours

Industrial

Mining Camp Containerised Water Plant

A 40ft container plant delivering 500 m³/day of drinking water to a remote mining camp.

Mining Camp Containerised Water Plant

The camp is 300 km from the nearest town. Everything had to arrive in one container and be operating within a week of delivery.

  • Brackish water RO, 500 m³/day
  • Pre-treatment and disinfection integrated
  • Arctic insulation package, -25 °C rated
  • Satellite remote support

Start with your water analysis

Tell us the source, the capacity and the target — we will design the train.

Our engineers reply within 12 working hours with a preliminary process design, equipment list and budget range.

WhatsApp info@www.zhongchunwater.com +86 195 5003 9985