A container plant moves 80% of the construction work from site to factory. On a remote project that is the difference between six weeks and six months.

What changes

  • Piping, wiring and insulation are done in a controlled workshop
  • The plant is wet-tested before shipment, so faults appear in the factory, not on site
  • Only three connections remain: power, feed water, outlet
  • Weather protection comes with the container

What to watch

  • Confirm the container rating (ISO, CSC) and the shipping route
  • Ask for a climatic package if the site exceeds 45 °C or drops below 0 °C
  • Insist on a factory acceptance test report with flows and pressures