A container plant moves 80% of the construction work from site to factory. On a remote project that is the difference between six weeks and six months.
What changes
- Piping, wiring and insulation are done in a controlled workshop
- The plant is wet-tested before shipment, so faults appear in the factory, not on site
- Only three connections remain: power, feed water, outlet
- Weather protection comes with the container
What to watch
- Confirm the container rating (ISO, CSC) and the shipping route
- Ask for a climatic package if the site exceeds 45 °C or drops below 0 °C
- Insist on a factory acceptance test report with flows and pressures