Island & Coastal
Containerised SWRO for a Coastal Resort
Two 20ft SWRO containers producing 600 m³/day of potable water for a Red Sea resort complex.
The resort drew water from a beach well with a TDS of 38,000 mg/L and needed 600 m³/day for guest rooms, irrigation and pool make-up. Two containerised trains were supplied with a shared DAF pre-treatment skid.
Scope
- Beach well intake and transfer pumping
- DAF pre-treatment, 2 × 30 m³/h
- 2 × 20ft SWRO containers, 300 m³/day each
- Remineralisation and chlorination
- Commissioning and operator training on site
Delivery from contract to water on site: 14 weeks. Power consumption measured at 3.6 kWh/m³.